shadow
Template Community / Forward Pass Calculation Precedence Diagram

Forward Pass Calculation Precedence Diagram

EdrawMax user profile image
Lisa Anderson
Published on 2021-02-26
Download
Download
Download EdrawMax
Edit Online
logoanimation
Forward Pass Calculations in Precedence Diagram Method (PDM), determine the minimum dates at which each construction activity can be performed and, ultimately, the minimum duration of a construction project. Forward pass is a technique to move forward through network diagram to determining project duration and finding the critical path or Free Float of the project.
Tag
precedence diagram
Report
0
1.4k
EdrawMax user profile image
Post
Recommended Templates