Pay
The Crown Hotel Piping Diagram

The Crown Hotel Piping Diagram

28mm28mm22mm22mm35mm35mm35mm35mm76mm54mm54mm414243444546474849Purge PointRun externallyalongroofOld boiler/ KitchenBoiler 1Boiler 2KitchenBoiler 3Boiler 4Boiler 5EXTERNALBOILER ROOMMAIN BUILDINGThe Crown HotelGas Schematic12th May 2021M01
12
0
1
publish time: 2021-05-13
info

Here is a piping and instrumentation diagram for the Crown hotel. Piping and instrumentation diagram, also called P&ID, is a drawing in the process industry. It presents the interconnection of process equipment and the instrumentation which is used to control the process. And this kind of diagram is mainly used for laying out a process control installation. Learn more details from this diagram, or try to make yours with ease.

See More Related Templates