shadow
Template Community / Product Backlog Work Breakdown Structure

Product Backlog Work Breakdown Structure

EdrawMax user profile image
Kiraaaa
Published on 2021-07-01
Download
Download
Download EdrawMax
Edit Online
logoanimation
The product backlog serves as the foundation for iteration planning. All work items should be included in the backlog: user stories, bugs, design changes, technical debt, customer requests, action items from the retrospective, etc. This diagram has four levels. First level is the project JEM. Second level is project JEM has been divided into 4 category- Source, Exterior, Interior & Certify. These sub categories are breakdown/branched into different tasks. And lastly the breakdown of tasks into subtasks. This diagram also tells us that from story 1 to 6 has high priority and story 7 to 9 has medium priority. EdrawMax allows its user to study similar diagrams from the already available templates.
Tag
Work Breakdown Struc
Report
4
545
EdrawMax user profile image
Post
Recommended Templates