Work Breakdown Structure for Project Office
Use immediately

Work Breakdown Structure for Project Office

PROJECT OFFICE

Front End

Correlate

RT System

Sci/Analysis

Site

System

Work Breakdown Structure for Project Office

Antenna

Receiver

Data Transport

Clock

M & C

PFB

Control/IO

Risk

Software

Binner

Mapper

GSM Pred

Calibration

RT

EOR

Solar/Helio

Transients

ASM

Light Curves

Infrastructure

Operations

Logistics

System Integrati...

End-to-end

EMC Compliance

Survey

13
0
2
publish time: 2021-07-01
Kiraaaa

Work breakdown structure is a hierarchical tree structure that outlines your project and breaks it down into smaller, more manageable portions. You can build a WBS by creating folders and subfolders, and can even go further to divide individual tasks into subtasks. This is the breakdown structure for a project office. In this the project office is breakdown into front-end, correlate, RT system, sci/analysis, site & system. These are again sub branched like, front-end into antenna, receiver, data transport, clock and M&C. correlate is sub branched into PFB, control/IO and risk. RT system is sub branched into software, binner, mapper, GSM pred., calibration and RT. Sci/analysis is sub branched into EOR, solar/helio, transient ASM light curves and survey. Site is sub branched into infrastructure, operation and logistics. And lastly system is sub branched into system integration, end-to-end and EMC compliance.

See More Related Templates