shadow
Templates Community / Work Breakdown Structure (WBS) for Comprehensive Cafeteria Renovation Project

Work Breakdown Structure (WBS) for Comprehensive Cafeteria Renovation Project

EdrawMax user profile image
zahiruddin zuhri
Published on 2023-06-09
logoanimation
This template represents a Work Breakdown Structure (WBS) for a cafeteria renovation project. The top level is "Cafeteria renovation," which is decomposed into three main branches: "Internal," "Foundation," and "External." The "Internal" branch further breaks down into "Electric" (with tasks like Lamp Installation, Motor Hood Fan, Smoke detector), "Plumbing" (including Sink Installation), and "Furniture" (such as Table & Chair, Kitchen Furniture). The "Foundation" branch focuses on the "Main Building" with components like Wall and Ceiling. The "External" branch covers "Mosaic," "Plaster," "Painting," and "Cleaning." This WBS helps in organizing and planning the renovation project systematically.
Tag
project management
WBS
Cafeteria Renovation
Report
0
167
EdrawMax user profile image
Post