Pay
Gantt Chart of Construction Schedule

Gantt Chart of Construction Schedule

S/LtaskStarting timeEnd TimeConstruction periodThe completion rate2018/10/82019/1/12020/1/12018/10/82019/1/12019/4/12019/7/12019/10/12020/1/12020/4/12020/7/11Investment decision2018/10/102018/11/2131.0 d.70%2Obtain land use rights, etc.2018/11/102019/2/1972.0 d.70%3engineering design2018/11/102020/6/8411.0 d.70%4"Three links and one leveling" etc.2019/2/72019/3/620.0 d.70%5Land excavation2019/2/272019/3/1513.0 d.70%6infrastructure2019/3/112019/7/1591.0 d.70%7Water supply and drainage installation2019/4/202019/5/2425.0 d.70%8Backfilling2019/5/42019/6/2537.0 d.70%9Basic acceptance2019/6/102019/6/112.0 d.70%10Main construction2019/6/122019/11/13111.0 d.70%11Main decoration2019/10/42019/10/1710.0 d.70%12Main experience2019/10/122019/10/185.0 d.70%13Infill wall masonry2019/10/172020/2/580.0 d.70%14Interior and exterior wall decoration2020/1/52020/5/1494.0 d.70%15Floor engineering2020/2/282020/4/2340.0 d.70%16Door and window installation2020/3/22020/5/2965.0 d.70%17Paint2020/4/62020/5/2940.0 d.70%18Elevator installation2020/5/162020/6/816.0 d.70%19Water facilities installation2020/6/12020/7/325.0 d.70%20Electrical installation and commissioning2020/6/262020/8/1436.0 d.70%Construction Schedule (multi-project/large time span)
58
1
2
publish time: 2021-03-04
Charlotte

This chart is a Gantt chart of construction period progress, which has the characteristics of multiple projects and a large time span. The content shown in the figure includes work content, duration, completion rate, start time and end time. The work content includes 20 items including investment decision-making, land excavation, engineering design, etc., as shown in the figure.

See More Related Templates